Products Description




Company Information | |||
[email protected] | |||
Mobile | +8613666033393 | ||
+8613666033393 | |||
13666033393 |
Technical Specifications
Parameter | Description |
---|---|
Model | SDCS-REB-1 |
Product Code | DCF1154914R0001 |
Function | Interface board for routing trigger pulses to forward and reverse thyristors |
Application | Used in DCR 500B / 600 Thyristor DC Drive Systems |
Mounting | Plugged into SDCS-PIN-51 at connectors X513, X113, and X213 |
Output Connections | X613 (forward bridge), X713 (reverse bridge) |
Dimensions | 254 mm x 25 mm x 248 mm |
Weight | 0.4 kg |
Operating Voltage | Supplied via SDCS-PIN-51 |
Installation | Front-inserted, ensure correct firing pulse routing |
Drives Transformer | Routes signals to SDCS-PIN-41 pulse transformer board |
Application Limit | Only supports one pair of forward and reverse bridges (12 thyristors max) |
FAQ
Frequently Asked Questions (FAQ)
Q1: What is the primary function of SDCS-REB-1?
A1: It routes trigger pulses from the SDCS-PIN-51 board to SDCS-PIN-41 pulse transformer boards to control thyristors in both forward and reverse bridges.
Q2: How is the SDCS-REB-1 installed?
A2: It is plugged into the X513, X113, and X213 connectors of the SDCS-PIN-51 board.
Q3: How many thyristors can SDCS-REB-1 support?
A3: It supports up to 12 thyristors – 6 for the forward bridge and 6 for the reverse bridge.
Q4: Can SDCS-REB-1 control multiple parallel bridges?
A4: No, SDCS-REB-1 is only suitable for single bridge applications. For parallel bridges, REB-2 and REB-3 are required.
Q5: Does SDCS-REB-1 need a separate power supply?
A5: No, it is powered by the SDCS-PIN-51 board.
Q6: How is the board fixed mechanically?
A6: It is inserted into a card holder and connected via plug-in interfaces, without the need for screws.
Q7: What is the difference between SDCS-REB-1 and SDCS-REB-2?
A7: REB-1 handles signal routing, while REB-2 performs power pulse amplification for parallel thyristor configurations.
Q8: Is SDCS-REB-1 hot-swappable?
A8: No, it is not recommended to insert or remove the board while powered. Always perform changes with the system powered off.
Tags
Packing & Delivery
We will use wear-resistant cartons to seal the boxes, and take photos for your confirmation before sealing. We will pack the boxes only after confirmation.
For express delivery, we will use DHL, UPS, TNT, FedEx and EMS.
Please rest assured that we have a deep cooperation with express delivery companies and can ensure that your goods are delivered to you in good condition.