Welcome to TilGames!

Email

sales@xmjzjsgs.com

WhatsApp

+8613666033393

ABB Bailey NFAN02 Fan Assembly

ABB Bailey NFAN02 Fan Assembly

Views:79

Payment Methods:T/T, PayPal, Western Union

Condition:New & In Stock

Shipping Port:Xiamen, China

Warranty:1 Year

Lead Time:1-3 Working Days

Certificate:COO

Courier partners:DHL, UPS, TNT, FedEx and EMS.

Business hours:7*24

Send Inquiry
Description
Parameter
FAQ
Products Description
https://www.tilgames.com/wp-content/uploads/2025/03/NFAN02-1.jpg
https://www.tilgames.com/wp-content/uploads/2025/03/NFAN02-1-1.jpg
https://www.tilgames.com/wp-content/uploads/2025/03/NFAN02-2.jpg
https://www.tilgames.com/wp-content/uploads/2025/03/NFAN02-3.jpg
Company Information
E-mail sales@xmjzjsgs.com
Mobile +8613666033393
Whatsapp +8613666033393
WeChat 13666033393
Parameter

Manufacturer:Bailey

Product Number:NFAN02

Product Type:Fan Assembly

Origin:Sweden (SE)

Dimensions:150 × 150 × 50mm

Weight:2.5kg

FAQ

Frequently Asked Questions (FAQ)

Q1: What is the primary function of the NFAN02 Fan Assembly?

A1: The NFAN02 is designed to provide efficient cooling for ABB’s control systems, ensuring optimal airflow and temperature regulation to maintain system reliability.

Q2: How do I install the NFAN02 into my existing system?

A2: The NFAN02 features a standard 3-pin Molex connector and compact dimensions, allowing for straightforward integration into compatible systems.

Q3: What maintenance does the NFAN02 require?

A3: Thanks to its durable construction and reliable ball bearings, the NFAN02 requires minimal maintenance. Regular inspections and cleaning are recommended to ensure optimal performance.

Q4: Is the NFAN02 compatible with non-ABB systems?

A4: While designed for ABB systems, the NFAN02 can be used in other applications that match its specifications. However, compatibility should be verified before installation.

Q5: Where can I purchase the NFAN02 Fan Assembly?

A5: The NFAN02 can be purchased through authorized ABB distributors or directly from ABB’s official channels.

Q6: What should I do if the NFAN02 fails during operation?

A6: In the event of a failure, it’s recommended to contact ABB’s customer support or an authorized service center for assistance and potential replacement.

Tags
Packing & Delivery

We will use wear-resistant cartons to seal the boxes, and take photos for your confirmation before sealing. We will pack the boxes only after confirmation.

For express delivery, we will use DHL, UPS, TNT, FedEx and EMS.

Please rest assured that we have a deep cooperation with express delivery companies and can ensure that your goods are delivered to you in good condition.


Leave Your Message


Leave a message